We design, build and operate microgrids on your site. Power in months, no CAPEX, and a bill that keeps falling.
Connect faster — Add usable power on site while the connection queue stays where it is. Expand ahead of grid reinforcement instead of behind it.
Lower energy OPEX — A fixed rate below what you pay today, with peaks managed before they land and flexibility working in your favor.
Keep production running — Critical operations stay up through an outage. The microgrid runs grid-interactive or islanded.
One intelligence layer. Two ways in.
Edgy InSync runs over the assets already on your site, or it comes embedded in a microgrid we build for you.
Edgy InSync
Connects and coordinates the assets you already run. InSync reads your site live, runs your assets as one system, matches every kWh to the cheapest source available to you, and offers spare flexibility into ancillary markets.
Edgy Microgrids
Selected technologies with InSync built in. Grid-interactive or off-grid. A modular combination of assets, sized to the site and orchestrated by InSync. Three configurations cover most of what industry needs.
Battery — Flexibility on site: lower energy cost and an easier grid connection.
Battery + CHP — Run the engine at its best point. Heat decoupled from the power sale.
Gas boiler + electric boiler + thermal storage — The cheapest available heat, with Scope 1 and CBAM exposure down.
No CAPEX, installation is quoted separately and disclosed before signature. You sign a long-term agreement, typically 10 to 15 years, for a rate below what you pay today. Edgy operates and remains system operator of the microgrid for its life.
End to end system integrator.
From the first site visit to the day it is running, one counterparty.
01 Assess the site — We read your load shape, your connection status and what is on site, then tell you straight whether a microgrid helps.
02 Design and Finance — We size the assets to your site and model the economics over the term. Then we fund the equipment and own it, so what you approve is an operating cost, not a capital budget.
03 Install and connect — Permitting, grid code work, procurement, project management and commissioning.
04 Optimise continuously — We do not hand over and leave. Edgy is the system operator of the microgrid it installs, for the life of the agreement.
Months, not years. Time to power for a battery and CHP retrofit on an existing industrial site, end to end. Traditional integrator: 20 months · Edgy: 6 months.
Assess your site's power potential.
A short technical conversation about your load, your connection and what is already on site. No capital expenditure either way.